Two OOG stabilizers shipped from the Tyrrhenian to the Black sea
scroll down
Just recently we coordinated the out-of-gauge shipment of two stabilizers.
Just recently we coordinated the out-of-gauge shipment of two stabilizers, 117.5-ton heavy and 12-meter long, that were shifted by road for about 50 kilometers from the factory to the Port of Genoa.
There the stabilizers, along with ten additional boxes of other components, were loaded on the M/V Mare, bound to the final destination of Tulcea, in Romania, on the Danube delta, to be installed on a cruise ship